Feasibility Study and Detailed Design of The Sixth Thai-Lao Friendship Bridge and Connecting Road (Ubon Ratchathani-Salavan) Project
  Year
              2017
          Category
              Engineering Services
          Client
              Decade Consultant Co., Ltd.
          Description
              Soil boring+Rock coring 17 boreholes
Test Pit 28 points
Dynamic cone penetrometer test (DCP) 6 points
          Test Pit 28 points
Dynamic cone penetrometer test (DCP) 6 points